Add fasteners joists - Build Ground-Level Deck. • Align the inside edge of the first length of decking with the chalk line. Drive two fasteners through the board into the center of each joist. Position each fastener ¾ to 1 inch from the edge of the board. • Approximate time: 3-5 hours. 8. Trim deck in straight line. Trim deck straight 

How to Lay Out a Deck on Un-Level Ground. When an outdoor If you want to construct a ground-level deck to replace a concrete or paver patio, digging the holes isn't necessary. You can construct a Place the joist hangers directly across from each other, spacing them no more than 12 inches apart. The joist hangers 

Installing Supports for a Ground Level Deck. The joists are rested directly on to a suitable foundation pad such as a building block or 50mm thick paving slab. The slab can be placed onto a bed of sand, sand/cement mix or lean mix concrete. To prevent the joists twisting, timber of the same size as the joists 

When measuring, keep in mind that the typical deck joist spacing is 16" O.C. (the distance between the centers of the tops of two adjacent joists). Less spacing An alternative to deck blocks is to use rectangular patio blocks, laid underneath the corners of the deck and at 4' to 6' intervals directly on the ground. Though the 

A platform-style wood deck that sits directly on the ground can be an attractive and useful addition to a walk-in garden or back yard. Build it on a level area, or as level as possible, and use concrete pier blocks to support the rim joists. In addition, use pressure-treated wood for the framing and a 

i.e. joists are supported on a nailing plate on concrete beam walls (refer. Figure 1). This method is acceptable as long as the concrete does not inhibit drainage. Likewise, timber bearers could be laid directly on a well drained gravel/sand or concrete base as long as they are of minimum in-ground Durability Class 1 or H5 

Railings & Features. All decking requires the same materials underneath the frame ledger, joists, beams & support posts in solid footing. If you're building an on-grade deck (a decking structure built just above the ground) then you might not need railings, features, posts or steps.

Only a few inches off the ground, this platform takes a little time but is easy once you get going. Or, check if corner blocks are level by running a straight board through the divots in corner blocks and checking with a level. Making sure everything is level, lay the 2" x 6" deck joists on edge inside the deck blocks. Measure 

Work out where you want to build the deck and compress any loose soil with a thumper or a heavy roller. 2. clear of the damp ground. Put a straight piece of wood on top of the slabs and check for level. Dedicated deck blocks that are slotted to take the joists of the frame are also available. 4. Make up a 

or through landscaping. As with all decking, it can be built against a building, possibly with patio door opening onto it, or free standing elsewhere in the garden. Check the level of the ground by laying out house bricks in position to support the end of each joist and evenly along the length of the joists to support it -.