what is benching hillside

SLOPE (BENCH) DRAINS. Drainage devices (including slope or bench drains), located throughout hillside areas, that are poorly maintained are the source of many flooding problems. With few exceptions, maintenance of these drains is the responsibility of the homeowner. KEEP THESE DRAINS CLEAR of debris and 

ground on the uphill side to slow or stop water coming down the trail. Digging Bench and Switchbacks. • A full bench trail is constructed by cutting the full width of the tread into the hillside, which is about one Pulaski length. The entire tread is dug down to compacted mineral soil. • Full bench is preferable in almost all cases 

The land manager is worried that by constructing full bench trail in the area we will destabilize the hillside because of the large amount of soil removed. The tallest backslope is right at the 3' mark, but the majority is 2' or less. There have been slides in the area in the past, but only where the primary stream 

Things that can be done to reinforce hillsides and slopes: Retaining Walls; Concrete Reinforcement; Drainage; Friction Piles; Benching. Hillside Repair Gallery . Hillside Repairs Los Angeles Hillside Retaining Wall Hillside Drainage Los Angeles. Call us today to schedule an inspection or request an estimate 

This Geotechnical Bulletin is intended to provide guidance on the use of special benching in highway embankment construction. Guidance for standard specification benched embankment construction is provided in the ODOT Construction and Material. Specifications, Item 203.05. Regarding standard 

Figure 11.1 Cut slope design options. Use Full Bench Cuts When the 0 - 60%. Low Cut. Can be Steep or Flatter. 2:1. Use a Balanced Cut and Fill. Section for Most Construction on Hill Slopes. 2:1 Typical a. Balanced Cut and Fill b. Full Bench Cut c. Through Cut large cut into the hillside. They can also be used for slope 

Where the embankment foundation is on hillside or another existing embankment, the foundation must be benched while the embankment is being constructed. For slopes 1:3 or steeper, refer to Benching Detail A. Cut 8 ft wide horizontal benches in the existing slope. Bench the slope as the embankment is placed and.

HILLSIDES. This Development Control Plan applies to the area shown on the Development Control. Plan map marked Development Control Plan 4 Hillsides and to This Plan identifies preferred dominant land uses for the hillsides, general provisions .. to minimise benching of sites; and to create an attractive built form.

In geomorphology, geography and geology, a bench or benchland is a long, relatively narrow strip of relatively level or gently inclined land that is bounded by distinctly steeper slopes above and below it. Benches can be of different origins and created by very different geomorphic processes. Hypothetical cross-section of a 

NOTES :: I, WHERE THE EMBANKMENT IS TO BE PLACED ON A HILLSIDE OR. ANOTHER EXISTING EMBANKMENT HAVING A SLOPE OF 3 TO I. OR STEEPER, THE FOUNDATION MUST BE BENCHED WHILE THE. EMBANKMENT IS BEING MADE,(SEE DIAGRAM ABOVE). 2, THE DIAGRAM SHOWS THAT BEFORE 

The general layout is similar to that for bench terraces. Hillside ditches require a simple road to connect them and a natural drainage area or a waterway system to safely drain the run-off. Consideration should be given to the sites of farm building and/or windbreaks. Waterways can be sited in the middle or at the end of the 

standardized requirements for over-excavation of embankment foundations similar to what had been developed for earthfill dams. This shows. Orange County's standard, introduced in 1965. Page 3. OVEREXCAVATION. ▫ Overexcavation involves removing poor quality foundation materials, such as the soil horizon,.

Paver Pete presents an explanation of bench cut excavations in a segmental retaining wall project. The angle of bench cut depends on the type of subsoil that

(a) Scope and application. This appendix contains specifications for sloping and benching when used as methods of protecting employees working in excavations from cave-ins. The requirements of this appendix apply when the design of sloping and benching protective systems is to be performed in accordance with the 

Trail Design Specialists, specialist in the design and construction of multi use trails. Mountain bike, pedestrian, equestrian.

Improper operation of an excavator while trenching, sloping or benching can have a big impact on productivity and can potentially place both people and equipment at risk. Oftentimes, it's the result of poor or inadequate training. In other cases, it stems from bad habits, misconceptions about how a particular process should